VOE Marine - Rapid Manufacture & Installation of Stainless-Steel Spiral Wound Ductwork

The client: VOE Marine

The industry: Marine / Offshore Equipment

The project: Fast-track fabrication and installation of stainless-steel spiral wound ductwork within a containerised system

 

Key Contributors

 

Internal: Airmatic Fabrication Team, Installation Engineers, Project Coordination Team

 

The scope included

  • Manufacture and installation of thin gauge 304 stainless steel spiral wound ductwork (approximately 0.7–0.9mm)
  • Replication of an existing ductwork configuration to ensure consistency with current systems
  • Assessment, reuse and potential relocation of existing onsite tapers where suitable
  • Use of riveted construction methods with coupling joints for efficient assembly
  • Sealing of all joints using standard silicone to ensure airtight performance
  • Coordination and delivery of all materials to site
  • Full installation carried out by Airmatic’s experienced engineering team
alt

Key Goals

  • Deliver fully fabricated and installed ductwork system within a compressed timeframe
  • Accurately replicate an existing ductwork design within a new environment
  • Maintain high standards of workmanship despite fast delivery requirements
  • Ensure all installed systems were robust, sealed and fit for purpose
alt

The solution and what we delivered:

 

To meet the tight deadline, Airmatic adopted a streamlined project approach, integrating design validation, fabrication and installation into a closely managed schedule. The fabrication team prioritised efficient production of the spiral wound ductwork using thin gauge 304 stainless steel, ensuring both durability and ease of installation. Close coordination between workshop and site teams enabled seamless transition from manufacture to installation.

 

By pre-planning installation sequences and utilising modular duct sections, Airmatic minimised on-site disruption and reduced installation time. The use of riveted construction and coupling joints allowed for fast assembly while maintaining structural integrity. All duct joints were carefully sealed using silicone to ensure reliable performance and prevent leakage within the system.

 

Technical hurdles we faced and the solutions we provided:

 

Tight Project Timeline: The project required completion within the same month as the initial enquiry, leaving minimal margin for delays.

 

Solution: Airmatic rapidly mobilised its internal teams, prioritised production scheduling and maintained clear communication with the client to ensure swift decision-making and execution.

 

Replication of Existing System: The new ductwork needed to mirror an existing installation while fitting within a different physical environment.

 

Solution: Detailed site assessment and measurement allowed Airmatic to accurately replicate the design while adapting it to suit the constraints of the container.

 

Installation Within a Confined Space: Working inside a shipping container presented access and space limitations.

 

Solution: The team used modular duct sections and efficient assembly techniques to enable safe and effective installation within the restricted environment.

 

What long-term benefits can the client see:

 

·        Minimal downtime due to fast project delivery

·        Reliable, high-quality ductwork system

·        Consistency with existing infrastructure

·        Confidence in workmanship and installation standards

 

 

How this project has impacted Airmatic:

This project reinforces our strength in delivering fast-track fabrication and installation projects, particularly where timelines are critical.

 

It highlights:

·        The efficiency of Airmatic’s in-house manufacturing capabilities

·        The value of experienced installation teams working in coordination

·        The company’s ability to adapt quickly to urgent client requirements

 

Ongoing support for the client:

 

Airmatic continues to support clients like VOE Marine with bespoke ductwork and stainless-steel fabrication solutions, offering rapid response capabilities for urgent and time-sensitive projects.

 

Conclusion

 

This project demonstrates Airmatic’s ability to combine speed, precision and quality in delivering stainless-steel ductwork solutions. From initial enquiry through to final installation, the team provided a responsive and reliable service, ensuring the client’s requirements were met without compromise.