alt

Mechanical Process Ventilation & Room Extraction Improvements

The client: A leading UK waste management company

The industry: Waste Management & Energy Recovery

The project: Design, support, manufacture and installation of upgraded mechanical process ventilation and room extraction systems for a Waste‑to‑Energy facility

 

Project Overview

Airmatic Ltd partnered with ERG to deliver extraction improvements within a Mechanical Pre‑Treatment (MPT) facility operated by a leading UK waste management company. The project involved the design, supply and installation of 14 bespoke extraction hoods to improve containment of airborne contaminants at key discharge points, alongside wider upgrades to the site’s room extraction and dust extraction systems.

The objective of the project was to improve environmental conditions within the facility, enhance operator safety and optimise overall extraction performance across the processing area. Due to the demanding nature of the operating environment, the system was engineered to maximise containment efficiency while maintaining operational access, incorporating robust materials and practical maintenance considerations throughout.

Airmatic worked closely with both ERG and the end client to provide a responsive and efficient solution from initial design through to installation and commissioning.

Scope of Work

The project included the design, manufacture, supply and installation of a complete extraction improvement package tailored to the operational requirements of the facility.

Core Project Elements

  • Design, supply and installation of 14 bespoke extraction hoods
  • Upgrades to dust and contaminant capture at conveyor discharge points
  • Strip‑out of existing ductwork within the WTP room
  • Mechanical installation and commissioning support
  • Integration with existing extraction infrastructure
  • Coordination of installation activities to minimise operational disruption

The upgraded extraction systems were designed to improve airflow management and provide more effective containment of airborne contaminants generated during material processing operations.

Technical Features of the System

To ensure long‑term reliability and maintainability within a challenging industrial environment, the system incorporated several specialist design and fabrication features.

System Features Included:

  • Galvanised steel extraction hoods fabricated as modular units
  • PVC strip curtain enclosures to contain airborne contaminants while allowing operational access
  • Hinged access panels for improved maintenance accessibility
  • Volume control dampers to assist with airflow balancing and performance optimisation
  • Swivel bends and transition sections to improve airflow efficiency
  • Bespoke fabricated ductwork designed specifically for the site layout and process requirements

Each element of the system was manufactured to support durability, ease of maintenance and efficient extraction performance within a high‑usage operational environment.

Installation & Delivery

Airmatic delivered the project using a coordinated installation approach designed to maintain efficiency while working within the operational constraints of the facility.

Installation & Delivery Scope

  • Full mechanical installation carried out onsite
  • Use of crane hire and lifting equipment to support installation activities
  • Mobile elevated work platforms (MEWPs) utilised for safe access
  • Coordinated works completed within a live operational environment
  • Responsive communication and project coordination throughout delivery
  • Efficient and well‑managed installation programme

The installation works were carefully planned to minimise disruption to ongoing site operations while ensuring safe and efficient completion of all mechanical works.

The solution and what we delivered:

A key part of the project’s success was Airmatic’s collaborative and responsive approach throughout both the engineering and installation phases.

The project benefited from:

  • Front‑end engineering support and early‑stage collaboration
  • Responsive communication and project management
  • Practical engineering solutions tailored to the operational environment
  • Efficient coordination between fabrication and installation teams
  • Flexible delivery approach to accommodate project demands

By maintaining close communication with both ERG and the end client, Airmatic ensured the project progressed efficiently while meeting programme and operational requirements.

Consistent Service Quality Across the Supply Chain

The project further demonstrated Airmatic’s ability to provide consistent service quality and dependable engineering support across the wider ERG supply chain.

Key Outcomes Included:

  • Strong early‑stage collaboration and practical problem‑solving
  • Consistent and responsive communication throughout delivery
  • High‑quality installation and service performance
  • Positive recognition across the wider ERG supply chain
  • Improved extraction efficiency and environmental performance within the facility

 

Conclusion

The successful completion of the Waste‑to‑Energy Room Extraction Works project demonstrates Airmatic’s ability to deliver practical, high‑performance extraction and ventilation solutions within demanding industrial environments.

By combining bespoke fabrication, responsive project management and efficient onsite installation, Airmatic was able to provide a fully integrated solution that improved contaminant containment, enhanced operational performance and supported safer working conditions throughout the facility.

The project also highlights Airmatic’s strength in delivering collaborative engineering solutions alongside major contractors and industrial operators. Through a combination of technical expertise, flexible delivery capability and consistent communication, Airmatic continues to support complex industrial and environmental projects across the UK with reliable, high‑quality ventilation and extraction systems.